
- The train is set to run between Delhi and Varanasi at a maximum speed of 160kmph.
- It is a 16-coach train, built in 18 months at a cost of ₹97 crore by the Integral Coach Factory, Chennai.
- It’s also the first locomotive-less train in the country.
- The fully air-conditioned train will stop at Kanpur and Allahabad and will have two executive chair cars.